CASE STUDY #1
Zennergy partnered with a destination hospital in Tucson AZ, offering the most modern and minimally-invasive heart and vascular surgery and advanced stroke treatment in the region.
THE FACTS
Number of FMDs Installed (4) 2″
Percentage of Water Savings 33%
Annual Water Savings 10,807,160 gallons
Investment Payback Period 2 months
CASE STUDY #2
Zennergy partnered with a 486-bed hospital in the Tucson AZ region specializing in joint replacement and cardiac pulmonary rehabilitation programs.
THE FACTS
Number of FMDs Installed (1) 4″
Percentage of Water Savings 7%
Annual Water Savings 3,288,392
Investment Payback Period 12 months